Day 1 Chedworth Villa …..and we are open

The turf is removed

The first trenches have been de-turfed and the test trenches dug in the year 2000 discovered.

Terram — a breathable membrane a tell-tale sign of the test trench from 2000

 

Ready to peel back the terram to find the sand

 

 

 

 

 

 

 

 

 

The breathable membrane was put on top of yellow sand that sits on the mosaic. Seventeen years ago it  was thought to be a good way to protect the mosaics and make it easy to re dig if checking on its condition. The problem is that the sand is builders sand and stays wet and the yellow colour  can stain the white tesserae, it sticks to the surface of the mosaic and takes a lot of work to clean it off.

IMG_1439

Ta Dar! we have a lovely mosaic in very good condition, hopefully this bodes well for the rest of the room and we will have much more to show you over the next few days.

IMG_1440

3 thoughts on “Day 1 Chedworth Villa …..and we are open

    • Sorry it was a follow on from the previous post, I have updated it now so it will say Chedworth Villa. We will be posting from the dig at Chedworth everyday for the next three weeks 😊

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s