Day One : Ready, steady, dig

Day One is always full of bits and bobs as equipment is unloaded, trenches pegged out, position of spoil heaps decided, volunteers briefed and sun cream applied.

Turf removed and a fresh layer to dig

Turf removed and a fresh layer to dig in the cross passage site, looking for doorways and trying to sort out phasing of walls -which came first.

Some of our lovely volunteers have returned and new ones join us for the first time. Steve and Max return for a day and become the finders of bones! all animal bones so far, mainly sheep.

Max and Steve find a group of bones

Max and Steve find a group of bones and look very pleased about it!

It’s lovely to have fine weather but digging in very hot conditions can be exhausting. We borrowed some of the Chedworth education historical enactors hats as heads and necks began to feel the sun.

A perfect hat for Megan

A perfect hat for Megan

Two more trenches were opened up, including the site from last year in front of the north bath house. Were all last years painted plaster came from , the first job is removing all the back fill to get back to where we stopped last year.

Last years trench being re excavated

Last years trench being re excavated, looking for the original floor levels and the other side of the blocked doorway in the bottom left of the picture.

A trench has been positioned behind the north bath house to look for walls and possible steps that would lead down into the stoke hole and water boiler room for the baths.

Alex, Seb and Carol cleaning back the top soil behind the bath house

Alex, Seb and Carol cleaning back the top soil behind the bath house

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s